Terms of Reference (TOR) for the Conduct of Feasibility Study (F/S) for the Kabulnan- 2 Multi – Purpose Irrigation and Power Project (K2MIPP)

Abstract:

The power generation component of the project will also help in meeting t he demand in the Mindanao power grid where a total of 1,600 megawatts ( MW ) additional capacity is seen to be needed in the planning period 2012 - 2030 to meet the electricity demand and the required reserve margin of the grid. T he grid, which , at present , barely meets the demand , does not have the capacity to produce the required reserve margin. The power generation component of the project , the feasibility of which is to be confirmed in the F/S updating, is envisaged to work towards diminishing this supply gap.

Info
Source InstitutionNational Economic and Development Authority
Source URLhttp://www.neda.gov.ph/wp-content/uploads/2014/08/Terms-of-Reference-for-the-Conduct-of-Feasibility-Study-for-the-Kabulnan-2-Multi-Purpose-Irrigation-and-Power-Project.pdf
Page Count30
Place of PublicationManila
Original Publication Date
Tags