Missionary Electrification Development Plan

Abstract:

As of the planning period, many if not a significant number of unelectrified barangays are located in remote, island barangays including the conflict areas in Mindanao. The immediate extension of distribution lines is not feasible in these barangays, hence, alternative approaches such as mini- or micro-grids, stand-alone renewable e energy systems and other rural electrification technology shall play the important role in their electrification.

Info
Source InstitutionDepartment of Energy
Source URLhttp://www.doe.gov.ph/doe_files/pdf/01_Energy_Situationer/2009%20MEDP%20fourth%20draft.pdf
Page Count28
Place of PublicationManila
Original Publication DateDecember 1, 2008
Tags