Energy Investment 2013

Abstract:

The Luzon and Visayas transmission grids are interconnected by submarine cables with a capacity of 400 MW. Similarly, the islands in the Visayas grid are also interconnected with various capacities shown in Figure 1. The feasibility study for the interconnection of the Visayas and Mindanao grid has already been concluded in March 2013 and project completion is targeted on 2018.

Info
Source InstitutionDepartment of Energy
Source URLhttp://www.doe.gov.ph/microsites/ipo%20web/linked%20files/2013/IPO%20Investment%20Kit%202013.pdf
Page Count52
Place of PublicationManila
Original Publication Date
Tags