Highlights of the Interim Mindanao Electricity Market Public Consultations

Abstract:

This document provides the highlights of the public consultations on the proposed establishment of the Interim Mindanao Electricity Market (IMEM) as a measure to immediately address the power supply situation in Mindanao. Two (2) legs of public consultations were held: the first in Cagayan de Oro City last 22 October 2012 and the second in Davao City last 14 November 2012.

In both public consultations, the DOE presented the Mindanao power situation followed by the presentation of the draft Department Circular directing PEMC to implement the IMEM. Thereafter, PEMC provided the initial design of the IMEM.

Info
Source InstitutionDepartment of Energy
Source URLhttp://www.doe.gov.ph/doe_files/pdf/01_Energy_Situationer/IMEM_Highlights.pdf
Page Count48
Place of PublicationManila
Original Publication DateNovember 1, 2012
Tags