Draft Final Report on the Environmental and Social Components | Digos-General Santos Road

Abstract:

The Digos-General Santos Road starts from Digos City, Dtivao del Sur and ends in General Santos City with a total road length of about 81.0 kms. The remedial works starts from Sta. 21 and end at Sta. 68. The problern and disaster prone areas have been identified during the feasibility study, which highlighted all works and countermeasures to be undertaken. The project road connects the cities of Davao, Digos City, is situated in the northern portion of the province of Davao del Sur. The road serves the port cities of northern and southern Mindanao.

The project focuses on the current situation of the road that requires remedial and additional engineering works. There are 34 sections along the road that have been designed for slope protection, improvement of drainage system, and other engineering measures that would address the problem landslides and road slips area.

Info
Source InstitutionWorld Bank
Source URLhttp://www-wds.worldbank.org/servlet/WDSContentServer/IW3P/IB/2007/06/06/000310607_20070606145104/Rendered/PDF/E14670v120EAP1EA1P079935.pdf
Page Count83
Place of PublicationManila
Original Publication Date
Tags