Department of Energy Circular No. DC2014-05-0010

Abstract:

The IMEM Operator shall consider additional constraints in its scheduling and settlement processes to reflect the technical characteristics of the facilities in the Mindanao Grid. The technical characteristics shall include, but not limited to, the minimum stable loading and ramping capabilities of the IMEM Generators.

Info
Source InstitutionDepartment of Energy
Source URLhttp://www.doe.gov.ph/doe_files/pdf/Issuances/DC/DC2014-05-0010.pdf
Page Count23
Place of PublicationManila
Original Publication Date
Tags