19th Electric Power Industry Reform Act Implementation Status Report

Abstract:

In Mindanao, the government still control the generation business with a total of 81 percent with NPC having 53 percent share while 28 percent for PSALM of the generation capacity in the grid. Aboitiz has a bit increased its share in the grid due to the commercial operation of the 42 MW Sibulan HEPP.

This report provides the summary update of the developments on the restructuring of the power sector covering the months of April to October 2011. The preparation for the attainment of the retail electricity market has noted significant events such as the Energy Regulatory Commission (ERC) declaring the completion of the per-requisite relative to the implementation of Retail Competition and Open Access (RCOA). Accordingly, the DOE took the necessary actions to ensure that participants are ready in the eventual implementation.

Info
Source InstitutionDepartment of Energy
Source URLhttp://www.doe.gov.ph/doe_files/pdf/01_Energy_Situationer/19th_EPIRA_Status_Report_Final.pdf
Page Count97
Place of PublicationManila
Original Publication Date
Tags