12th Electric Power Industry Reform Act Implementation Status Report

Abstract:

As of April 2008, the ERC approved 119 TSCs with electric cooperatives and private distribution utilities, 56 in Luzon, 31 in the Visayas and 32 in Mindanao. There are TSCs that have expired following ERC approval and been renewed while there are 25 DU-CSEEs are being readied for filing with the ERC. Eighteen (18) DU customers have been allocated to privatized or bidded out power plants.

Mindanao posted an increased of 6.0 percent in electricity sales with the “others” sector exhibiting 40.0 percent increased followed by commercial sector at 7.0 pe rcent, residential sector at 5.0 percent and industrial sector at 3.0 percent.

Info
Source InstitutionDepartment of Energy
Source URLhttp://www.doe.gov.ph/doe_files/pdf/01_Energy_Situationer/12th_EPIRA_Status_Report.pdf
Page Count84
Place of PublicationManila
Original Publication Date
Tags